Head east on Waters EdgePartial restricted usage road
0.1 km
Keep right to continue on College Ave
0.6 km
Continue onto Mill St/A229Continue to follow A229
1.2 km
At the roundabout, take the 2nd exit onto Royal Engineers' Rd/A229
0.6 km
At the roundabout, take the 3rd exit and stay on Royal Engineers' Rd/A229Continue to follow A229
1.1 km
Take the M20 ramp to London/Ashford/Aylesford/Dover
0.3 km
At The Running Horse Roundabout, take the 2nd exit onto the M20 ramp to London
1.5 km
Keep right, follow signs for M20/London and merge onto M20
9.6 km
Take the M26 exit toward M25(w)/Heathrow Airport/Gatwick Airport/Sevenoaks/A25
1.1 km
Continue onto M26
14.5 km
Continue onto M25
18.8 km
At junction 7, take the M23 (S) exit to Brighton/Crawley/Gatwick
1.6 km
Merge onto M23
22.2 km
Continue onto A23
25.3 km
Slight leftGo through 1 roundabout
0.6 km
At the roundabout, take the 2nd exit onto the A27 ramp to Lewes/Newhaven
0.4 km
Merge onto A27
9.3 km
At the roundabout, take the 2nd exit and stay on A27
3.4 km
At the roundabout, take the 2nd exit and stay on A27
1.4 km
Continue straight to stay on A27
1.0 km
At Beddingham Roundabout, take the 2nd exit onto A26
8.2 km
At the roundabout, take the 3rd exit onto Drove Rd/B2109
65 m
Continue straight to stay on Drove Rd/B2109
86 m
Turn left
68 m
At the roundabout, take the 2nd exit
36 m
Turn leftDestination will be on the right
0.2 km
Newhaven Port, United Kingdom