Head east on The Glebe toward Church Hill
28 m
Turn left onto Pump Ln
0.4 km
Slight left onto Chelmsford Rd/B1010Continue to follow B1010
3.9 km
At the roundabout, continue straight onto Chelmsford Rd/A414
2.6 km
At the roundabout, take the 2nd exit onto Main Rd/A414
3.7 km
At the roundabout, take the 1st exit onto the A12 ramp to London/Harlow/A414
0.7 km
Merge onto A12
16.5 km
Keep right to continue on Ingatestone Byp/A12Continue to follow A12
7.3 km
Take the M25/A1023 ramp to Stansted Arpt/M11/Dartford Xing/Brentwood
0.3 km
At the roundabout, take the 5th exit onto the M25 ramp to M11/M1/Stansted Arpt/Watford
0.4 km
Keep right and merge onto M25
50.1 km
At junction 21, exit toward M1/Luton Arpt
2.4 km
Merge onto M1
22.9 km
Take the A5 exit toward Aylesbury/A505/Dunstable (N)
0.5 km
At Chalton Roundabout, take the 2nd exit onto Dunstable Northern Byp/A5
2.8 km
At the roundabout, take the 2nd exit and stay on Dunstable Northern Byp/A5
1.8 km
At the roundabout, take the 2nd exit onto Watling St/A505
0.4 km
At Chalk Hill Roundabout, take the 2nd exit onto A505
3.1 km
Turn left toward Stanbridge Rd
58 m
Turn left onto Stanbridge Rd
0.7 km
Continue onto Castle Hill Rd
0.5 km
Totternhoe Castle, United Kingdom